Order the development of an individual design, preparation of a layout for plotter cutting - our designers will prepare a professional layout in accordance with your task and technical requirements.
Name/Quantity | до 0,5 | 0,5 - 1 | 1 - 5 | 5 - 10 | 10 - 20 | 20 - 40 | 40 - 100 | >100 |
---|---|---|---|---|---|---|---|---|
1st level of difficulty (more than 50 cm), for 1 sq.m. | 16,1 | 13,6 | 12,1 | 10,4 | 9,7 | 9,3 | 7,6 | 3,7 |
2nd level of difficulty (10-50 cm), for 1 sq.m. | 32,3 | 29,5 | 26,2 | 24,6 | 23 | 21,4 | 18,9 | 9,4 |
3rd level of difficulty (5-10 cm), for 1 sq.m. | 48,5 | 45,3 | 42,1 | 40,4 | 38,2 | 36,6 | 35 | 22,5 |
4th level of difficulty (3-5 cm), for 1 sq.m. | 76,9 | 72,4 | 66,8 | 64,2 | 61,5 | 58,4 | 55,9 | 38,1 |
5th level of difficulty (2-3 cm), for 1 sq.m. | 154,4 | 145 | 134,2 | 128,3 | 123,2 | 117 | 111,3 | 75,3 |
6th level of difficulty (1-2 cm), for 1 sq.m. | 308,6 | 289,9 | 267,9 | 256,6 | 246,2 | 233,9 | 222,6 | 154 |
7th level of difficulty (up to 1 cm), for 1 sq.m. | 525,3 | 493,3 | 455,3 | 436,1 | 417,3 | 398 | 379,3 | 261,8 |
- The minimum cost of the order is 0.01 sq.m. of cutting the corresponding material.
- With a large number of closed elements, the level of complexity of cutting increases.
- All non-standard works and volumes are calculated separately by the head of the pavilion.
Image sampling (cleaning)
Name/Quantity | до 0,5 | 0,5 - 1 | 1 - 5 | 5 - 10 | 10 - 20 | 20 - 40 | >40 |
---|---|---|---|---|---|---|---|
1st level of difficulty (more than 50 cm), for 1 sq.m. | 15,9 | 14,7 | 12 | 10,6 | 9,8 | 8,9 | 7,5 |
2nd level of difficulty (10-50 cm), for 1 sq.m. | 32 | 29,4 | 26,2 | 24,9 | 22,3 | 20,9 | 19,5 |
3rd level of difficulty (5-10 cm), for 1 sq.m. | 48,5 | 44,9 | 42,3 | 39,7 | 38,2 | 36,7 | 34,5 |
4th level of difficulty (3-5 cm), for 1 sq.m. | 77,4 | 72,5 | 66,7 | 64,3 | 61,4 | 58,2 | 56 |
5th level of difficulty (2-3 cm), for 1 sq.m. | 231,9 | 217,5 | 200,6 | 192,5 | 184 | 175,8 | 166,9 |
- The selection after cutting the 6th and 7th difficulty levels is equal to the selection of the 5th level. The sample cost is calculated based on the actual area.
Materials for plotter cutting
Name/Quantity | до 1 | 1 - 1,5 | 1,5 - 3 | 3 - 5 | 5 - 10 | 10 - 20 | 20 - 40 | >40 |
---|---|---|---|---|---|---|---|---|
Black, white, color, for 1 m.p. | 38,7 | 37,6 | 37,5 | 37,1 | 35,4 | 34 | 32,4 | 31,6 |
Golden, silver, for 1 m.p. | 38,7 | 37,6 | 37,5 | 37,1 | 35,4 | 34 | 32,4 | 31,6 |
Reflective, for 1 m.p. | 244,3 | 239 | 228,9 | 221,8 | 213,6 | 205,4 | 197,3 | 180,1 |
Sandblasting, for 1 m.p. | 134,9 | 132,4 | 129,5 | 128 | 126,4 | 123,4 | 118,3 | 113,7 |
Fluorescent, for 1 m.p. | 166,8 | 162,1 | 156,4 | 151 | 145,5 | 140,7 | 134,9 | 123,6 |